Hedgehog Grove Solar Farm: About The Project
The proposed development would include the construction, operation, maintenance, and decommissioning of a grid connected solar farm facility. Located between Felsted and Bartholomew Green, the site would have the capacity to generate up to 98 MW of electricity, enough to power over 45,000 typical family homes per year*.
The emissions savings are equivalent to removing over 15,000 cars from the roads, or over 32,000 tonnes of CO2e.**
We are currently holding our consultation for our proposals, which will run from 8 September – 6 October 2025. Further information may be found on our Process page.
*Presuming a 15% capacity/load factor across a single year, based upon average domestic electricity consumption per home (temperature corrected) as per Energy Consumption in the UK (published September 2024, Table C9 of ECUK: Consumption data tables).
**This assumes no emissions associated with the solar PV generation.
Indicative timeline
Autumn – Winter 2025
Pre-Planning and project set up
February 2025
Project live
February – June 2025
Initial consultation via the Community Liaison Group
8 September – 6 October 2025
Consultation Period
22 September 2025
Consultation event 1 - Felsted Memorial Hall, 11:00 - 16:00
23 September 2025
Consultation even 2 - Rayne Village Hall, 13:00 - 18:00
October – December 2025
Consideration of feedback and preparation of an application
Early 2026
Application submission
Early stage indicative site layout plan
Our indicative site layout further below shows our initial plans for the Hedgehog Grove Solar Farm. It shows where the solar panels and key infrastructure could be located within the project boundary, as well as land we anticipate using for biodiversity and other environmental designations. The site has been designed to minimise impacts on existing trees, hedges, woodlands, and Public Rights of Way (PRoW).
During the consultation period, we are seeking feedback on the masterplan, including the proposed site layout and electricity connection*, with the aim of reducing potential impacts of the project on the local area.
Detailed design
Detailed designs are still being developed, and we will be providing further information at our consultation events on 22 September 2025 at Felsted Memorial Hall, 11.00-16.00 and 23 September 2025 at Rayne Village Hall, 13.00-18.00. In the meantime, we encourage the community and other stakeholders to provide feedback at this stage of the project’s development.
*We are currently exploring cable route options.
Consultation feedback
If you would like to provide feedback on the latest consultation regarding Hedgehog Grove Solar Farm, please visit our Contact Us page where we have a dedicated Consultation Feedback Form.